Seismic safety already in the construction phase

  • Equipped with an anti-seismic device pre-installed in the factory, the Sismi PDTI® column ensures seismic resistance already during the construction of the building.
  • The Sismi PDTI® Column has higher ductility reserves than reinforced concrete systems. It absorbs the seismic action better, reducing the stress on the structure above.

Fast return on investment

  • Reduction of the building construction time of at least 40% compared to traditional systems, ideal for new buildings or renovations.
  • Certain costs.
  • Irrelevance of weather conditions to the execution of the work.
  • Low maintenance costs.

Efficient and safe solution

  • Installation speed: 8 minutes for a multi-storey column.
  • If you install a three-storey PDTI® NPS® column, you already have the vertical element for the 2 upper storeys ready - a considerable time saving.
  • Reduction of 80% of labour requirements on site.
  • Increased safety on site.
  • Almost total elimination of props on site.
  • Delivery of beams, columns and slabs at the time of installation, without the need for storage space.

Native fire resistance

  • Native fire resistance, without the need for post installation treatments. A saving in terms of costs and time.
  • NPS® elements can also be used as visible architectural elements.

High structural flexibility

  • Maximisation of usable space in width and height thanks to pillars with compact sections.
  • Flexibility in the distribution of interior spaces, with ease of changing the layout over time.