Exact positioning without vibration

  • Positioning of columns by means of the Zenith device ensures
  • an exact plano-altimetrical placement.
  • The pillar is not driven in, but lowered, using the precision of gravity.
  • This ensures not only exact millimetric positioning but also a drastic reduction in the vibrations normally caused by drilling activities, which are completely avoided with Zenith.

Speed with definitive structures right away

  • The beams rest on the diaphragms and act as both struts and support beams.
  • With NPS®, definitive structures can be used immediately, avoiding the use of temporary struts.
  • Excavation and slab installation take place simultaneously. First the pillars are lowered and then the beams and slab are laid.
  • NPS® elements are natively fire resistant, without the need for additional treatments.
  • Ground level is available shortly after the start of construction, as this is the first level to be completed. Then proceed in depth. Ideal for transitable squares.

Less impact on the neighbourhood

  • The impact of the works on the neighbouring context is reduced thanks to the maximum rationalisation of the construction site areas.
  • No storage areas are needed for NPS® products,
  • The construction site is limited to its own perimeter, with no easement required.
  • Avoid the skyscraper syndrome. With Top-down, excavation takes place indoors, underground and not in sight.