Slab laying and casting

The slab is then laid. Only at this point is the completion casting carried out, according to the instructions and prescriptions of the manufacturer and/or supplier of the slab.

If prestressed panel slabs are used for hollow core slabs or similar, the anti-tipping systems installed on the primary beams must be used before the element is unhooked.

The completion of NPS® beams is usually done with standard (non-self-compacting) concrete and is done without the risk of air bubbles. Vibration is also simple, thanks to the lattice structure of the beam itself.