Reduced emissions throughout the life cycle

  • NPS® beams are modelled in BIM, with the lowest possible use of raw materials from the outset.
  • They are produced in the factory using both self-generated energy and - as of January 1, 2022 - energy derived entirely from renewable sources.
  • Logistics is also low emission. Tecnostrutture gives priority to green-fuel and intermodal transport.
  • Site organization is simplified thanks to the fact that fewer workers are needed for installation: a team consists of just three fitters and a crane operator, compared to the large work teams of traditional systems.
  • Reducing on-site activities increases construction speed by an average of 40%, with positive social effects on the local community.
  • There are also advantages in relation to the drastic reduction of formwork, wood and props that are no longer necessary since the structures are self-supporting. This saves trips to bring in and return the temporary materials as well as their production. The result is a substantial contribution to the reduction of construction site waste and scrap, with NPS® products arriving ready for assembly.
  • At the end of the building's life, NPS® beams are removed through selective demolition, which allows for the complete reuse of the steel and concrete used.
Require information