The internal route through the site and the material storage area are agreed with the site manager.
NPS® columns can be lifted and handled with normal lifting equipment, such as cranes or crane trucks. The weight of each structural element is indicated in the manufacturing drawings.
For technical handling instructions, please refer to Tecnostrutture’s product assembly and installation booklet.