New auditorium and Oratorium Church at the headquarters of the Ass. of Volunteers for Christian Social Service.
Multi-level structure with decks supported by beams coupled with 26 m spans, 120 cm high.
The beams were designed in 3 sections for easier transport, with assembly to be executed on site. Assembly and lifting operations were carried out over 3 days, handling beams for a total weight of 200 tonnes.
A special feature of the structures, the bore holes designed for installing utilities.