It only takes two workers and a crane operator to install an Airfloor® panel. A team of three lays 1000 m2 of slab per day.
Airfloor® panels can be stacked and lifted 5 at a time. Crane pulls drop dramatically by about 80%.
The floor slab is laid with precast mortar, the distribution reinforcement is positioned and then the completion pour is carried out immediately. There is no risk of leaking since the panels adhere to each other thanks to the shaped profile.