Efficient and safe solution

  • Installation speed: 8 minutes for a multi-storey column.
  • If you install a three-storey PDTI® NPS® column, you already have the vertical element for the 2 upper storeys ready - a considerable time saving.
  • Reduction of 80% of labour requirements on site.
  • Increased safety on site.
  • Almost total elimination of props on site.
  • Delivery of beams, columns and slabs at the time of installation, without the need for storage space.
Require information