The beams rest on the diaphragms and act as both struts and support beams.
With NPS®, definitive structures can be used immediately, avoiding the use of temporary struts.
Excavation and slab installation take place simultaneously. First the pillars are lowered and then the beams and slab are laid.
NPS® elements are natively fire resistant, without the need for additional treatments.
Ground level is available shortly after the start of construction, as this is the first level to be completed. Then proceed in depth. Ideal for transitable squares.